Installation and fitting

To install our concrete panels on a wall, simply prepare a clean, dry, and level surface, then secure them with suitable adhesive or mechanical fasteners while ensuring proper alignment.

All types of walls or interior partitions in good condition. They must be flat, dry, and dust-free.
Depending on the nature of the surface, it may be necessary to apply a primer to improve the adhesive's bonding.
Note: If in doubt about the nature of the existing wall, it is recommended to conduct a test of adhesion beforehand.

To adhere the panels to the wall, a hybrid polymer adhesive such as Hybrifix 550 (provided by us) or an equivalent should be used.

If mechanical fastening is required by the specifications, the panels can be drilled and screwed from the front, with the screw holes then filled using the touch-up kit. A preliminary test is recommended to validate the aesthetic result.

Unlike adhesive installation, mechanical fastening does not allow for panel adjustments. Due to possible variations in panel thickness, slight unevenness may appear at the joints.

Cutting is done dry, using:
- A cutting table + plunge saw equipped with a diamond blade + guide rail.
- An angle grinder equipped with a diamond blade.
For a clean, splinter-free cut, the cutting should be done with the concrete side facing up

Concrete LCDA performs custom cuts directly in its workshop.
The cuts can be straight or at a 45° angle.

Note:
- It is always preferable to make at least the final cuts on-site, depending on the actual conditions of the project.
- Cuts at a 45° angle are much more fragile during handling

Search for products by application, by material, by color or by texture

Discover La Matériauthèque